Collegiate Sport Centre 

Description Refurbishment of the existing collegiate sport centre on the upper school site. 

The existing building was built during the 1960s. It had become outdated and was not functioning well. There was limited ventilation and was poorly lit. The heating system was not working to capacity. The building’s fire system was also dated and reduced the capacity of the site. 

A major task of this project including re-roofing the Grade II listed site. Other tasks saw new electrics including ECB (English and Welsh Cricket Board) standard LED dimmable lighting. Improvements were made to the ventilation.  

The refurbishment saw a new entrance foyer with improved accessibility. We were also able to refurbish the office space and stores. Specialist flooring was fitted in the sports hall along with soft wall cladding. The new changing rooms were also implemented. 

Through these improvements we were able to create a safe place for students to practice sports.   

The extensive works were completed in a live school environment. We were able to complete this fast-track programme under budget. 

Marlwood School

Image Licence: TBC

Project Data

Project Features:

  • Installation of new roof.
  • Specialist flooring.
  • Soft cladding walls.
  • New entrance foyer, offices, changing rooms and storage areas.
  • Fast track project delivery. 
Chawton Hill Regulated by RICS

London office

50 Gresham Street,
London, EC2V 7AY

020 7920 9950
mail@burkehunteradams.com

bath office

7 Seven Dials, Saw Close,
Bath, BA1 1EN

020 7920 9950
mail@burkehunteradams.com