Leominster Health Hub

Description – Burke Hunter Adams have been recently appointed as Quantity Surveyors on the Leominster Health Hub, in Leominster, Herefordshire. The project involves the construction of a new health centre and pharmacy on a brown field site behind the Dale Steel fabrications building.

The building is due to be a two-story BREEAM Excellent building, designed by Stride Treglown Architects and Project Managed by Osmond Tricks.  Cambria and Hydrock are the other consultants involved.  The project includes many energy-efficient features, such as air source heat pumps, MVHR units and photo voltaic panels.

 

Hampstead Athletic Track
Sketches prepared by James Holyoak.

Project Data

  • Service: Quantity Surveyors
  • Client: FH Dale 

Project Features:

  • The project is expected to start in 2024 with completion in 2025. This is subject to the usual FBC sign-off from NHS England and the local commissioning body.
  • The project Value is estimated to be in the region of £7m with extensive external works, SUDS systems and large swales being formed on the site.
Sketches prepared by James Holyoak